Controlling web gauge and tensile strength saves >£500k p.a.
Raw material yield improvement and process control – geosynthetics
Business
Owner:
Private Geosynthetics Company
Objective:
Reduce specific cost of raw material usage by decreasing gauge variation and at the same time improving tensile strength
Results:
• 8% reduction in polymer usage per square metre whilst improving tensile strength
• Total annualised material savings in excess of £525k p.a.
Approach
• Form a multi-disciplinary site team and coach them to use our problem solving approach
• Identify the process variables that give rise to break rate, gauge variation and high edge waste - and bring them under control
• Understand what drives cross web tensile strength versus the machine direction; change the material lay up pattern to achieve a 1:1 ratio and therefore increase throughput
In turn, this frees capacity for further sales growth
© Marchington Consulting Limited 2001 - 2024. All Rights Reserved. Registered in the United Kingdom No 13068272